What’s PPA?

Potential Problem Analysis

I read some investment journal, the writer talk about “Potential Problem Analysis” or “PPA”. It looks interested and make me blink about concept. So I start with google to searching in deep extend. I founded so many “PPA information” but one of all is from “Kent Blumberg Blog; http://kentblumberg.typepad.com”

One word on Kent is “No Plan is perfect – not even yours!”. That’s ture. The project manager’s only duty is to ensure the success of a project by minimizing risk throughout the lifetime of the project. That is easy definition but it composite of huge responsibility.

So project manager should have tools or methodologies to manage project. One of many tools is “Potential Problem Analysis” or “PPA”.

PPA’s aim is to provide a challenging analysis of an idea being developed or action plan so that you can determine ways in which it may go wrong.

A substantial amount of effort is required to carry out the analysis thoroughly and therefore the method is usually set aside for the more ultimate action plan.

1. Define the Key requirements, a ‘must’ – outputs, actions or events that must take place if the implementation is to be successful. Failure of any of these is likely to cause problems.

2.Record and investigate all possible problems for each of the key requirements that have now been identified, listing all ‘potential problems’ – i.e.potential ways it could go wrong (a technique such as Negative Brainstorming could help) and look at each of them (a technique such as Five Ws and H could help). If you have come up with an excess of possible problems, it is advisable to make a initial estimate of the by and large risk that each problem creates, so that you can give attention to the rest of the analysis on those that offer the greatest risk.

3.List possible causes for each potential problem, and the risk associated with it, the risk reflects both the likelihood of an event, and the severity of the impact if it did, so that ‘high likelihood/high impact’ causes present the highest risk.

4.Develop preventative actions where possible rather than having to muddle through a problem after it has happened. Where possible try to develop ways of preventing potential problem causes or minimising their effects and estimate the residual risk that might still remin even if preventative action were taken.

5.Develop contingency plans where necessary, i.e.where problems would have serious effects, but you cant prevent them, or these is a high residual risk even if you do.